Fixtures & multiple baths
High-end fixtures need the right rough-in dimensions, valve locations and blocking. We review the fixture schedule before installation.
Built around the fixtures, systems and finish details your house calls for. Work coordinated with the builder and the owner.
Send plans for a bidSelections matter before the walls close.
High-end fixtures need the right rough-in dimensions, valve locations and blocking. We review the fixture schedule before installation.
Tankless equipment and recirculation systems should be discussed alongside the layout and expected hot water demand.
Ranges, fireplaces and radiant heating affect the piping and equipment scope. Include the proposed appliance information with the plans.
The trim work follows the fixture selections. Connections and the punch list are checked as the job moves toward completion.
A complete plumbing scope, built around your construction schedule.
Water service, sewer laterals and under-slab drains. In place before the pour.
Drain, waste, vent, supply and gas piping. Coordinated with the framing and other trades.
Pressure tests and rough inspections. The work checked before the walls close.
Fixtures, valves and final connections. From the first pipe to the last fitting.
Send your drawings, fixture schedule and project location.