Underground & site
Water service, sewer laterals and under-slab drains. In place before the pour.
A custom home brings more to the plumbing plan than a count of bathrooms. For Princeton new builds, teardown-and-rebuild projects and major additions, we review the fixture selections, hot water demand and the routes available for supply and drain piping together. Multiple baths, a kitchen with gas appliances and a recirculation system all affect the scope. So do the details behind the finished walls: valve locations, tub dimensions and the framing space that the fixtures need. We work with the builder and owner to understand those decisions before the rough-in is closed up. On a replacement home or addition, send any information you have about the existing service connections. Public utilities and private well or septic systems require different scope discussions, so identify the site conditions rather than assuming a connection type. Send architectural plans and your fixture schedule, even if a few selections are still open, and we can discuss the plumbing work from underground through final trim.
Send the architectural drawings, fixture schedule and site details for your bid.
Send plans for a bidPlumbing for your Princeton build, from underground to final trim.
Water service, sewer laterals and under-slab drains. In place before the pour.
Drain, waste, vent, supply and gas piping. Coordinated with the framing and other trades.
Pressure tests and rough inspections. The work checked before the walls close.
Fixtures, valves and final connections. From the first pipe to the last fitting.
Yes. Include model numbers and installation requirements where available, particularly for tubs and concealed valves.
During design. The layout and equipment choices affect the piping needed before walls are closed.
Yes. The new home's demand and the existing connections should be reviewed together.
Send your drawings, fixture schedule and project location.